KitLog pro

Powered By Kitlog Pro v2.0

Marks RV8 Web Site
' style=
Date:  10-13-2013
Number of Hours:  3.00
Manual Reference:  7-7
Brief Description:  Rivetting Tanks

Rivetted the entire top of the right tank. The light went on and I figured out I could do the first rivet in each of the five rows at the same time. Then the second, etc. etc. Got the main rivets in the tank done in about and two hours. Had lots of sealant left, so I finished the end ribs on the top and then the bottom.
' style=

Rivetting the top

Rivetting the top

' style=

Rigth top finished

Rigth top finished

' style=

Bottom ends finished

Bottom ends finished

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.