Lots of misc jobs. I adjusted the rod end bolts so that all the elevators are squared up and clearances correct. That alone took two hours. I removed a little bit of the flange on the lower elevator rib to allow the elevator horn to swing completely to the stops. Finally drilled out the holes in the horns for the bolt linking the two. (The bushing between the two was < 0.25" so I had to use PVC to protect it instead of pipe.)