KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-6-2008
Number of Hours:  3.00
Manual Reference:  Map box
Brief Description:  Map box preparation

Today I assembled and match drilled the two halves of the map box. Then I cut the instrument panel and sub panel holes as well as trimming the right forward conopy deck to accomodate the map box.
' style=

Map box clecoed into position

Map box clecoed into position

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.