Powered By Kitlog Pro v2.0
Marks Web Site
RV-7A
Instrument Panel
2-6-2008
< Previous Log Entry
Next Log Entry >
Date:
2-6-2008
Number of Hours:
3.00
Manual Reference:
Map box
Brief Description:
Map box preparation
Today I assembled and match drilled the two halves of the map box. Then I cut the instrument panel and sub panel holes as well as trimming the right forward conopy deck to accomodate the map box.
Map box clecoed into position
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
606
2407
Empennage
59
221
Engine
2
7
Firewall Forward
72
350
Fuselage
260
1134
Instrument Panel
25
102
Miscellaneous
45
158
Shop Supplies
1
2
Wings
142
433
Copyright © 2001-2024 Matronics. All Rights Reserved.