KitLog pro

Powered By Kitlog Pro v2.0

BushCaddy ELSA
' style=
Date:  3-19-2007
Number of Hours:  4.25
Manual Reference:  Section F
Brief Description:  Worked on bottom skin

Laid out rivet line and drilled for rivets on PF-157A, PF-157B, PF-167, PF-212, and PF-217. Laid out for area of no rivets for landing gear attachments. Also laid out for PF-170 to be able to move it for switching from taildrager to tri-gear. I will be installeing bolts there with big washers while the PF-170 is in the other space. This makes it the Voyageur model. Lots of lay out of the rivets. Try to be in line with the solid rivets in the cabin on the side frames and space the rivets so you do not drill through the rivets already in place.Once the bottom is clamped in place work from the center out so you can use the wing clecos to pull the corrners tight then dril the edges. Hold the bottom with clecos while you are setting the landing gear attachments.
' style=

Yes its me

Yes its me

' style=




' style=

Marks on side are were solid rivets are

Marks on side are were solid rivets are

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.