KitLog pro

Powered By Kitlog Pro v2.0

BushCaddy ELSA
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-25-2007
Number of Hours:  2.50
Manual Reference:  Section F
Brief Description:  Started the cabin

Turned fuselage back over and checked alignment. This is one strong plane ever thing is still in alignment after all that work on the bottom side. Looked over the drawings for the cabin and started laying out parts. Clamped part PF-123 and part PF-124 as per drawing. Drilled bolt holes for AN 3 and deburred. Pulled parts for right side of cabin and laid out on table. CNC is a great thing. I clecoed the 3/32nd holes and drilled for the 425-4-5 rivets and clecoed with the 1/8th clecos. I only bought 15 of the 3/32 clecos and was wanting about 30 more but by doing a section at a time I was able to swap out to the 1/8" and continue along. Removed clecos and deburred all holes and primed were there will be metal to metal contact.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.