Powered By Kitlog Pro v2.0
JAMES'S WEB SITE
RV-10
Empennage
4-30-2011
< Previous Log Entry
Next Log Entry >
Date:
4-30-2011
Number of Hours:
2.00
Manual Reference:
6-4
Brief Description:
Prepared Vertical Stabilizer for priming
Used Alumiprep and a Scotbrite pad to clean all parts of the VS and let dry.
Image 1 parts were dipped in Alodine for 3 minutes and then rinsed and dried.
Image 2 the parts were primed with Boeing 10P4-2 & EC-117S. Two part epoxy primer.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
14
43
Empennage
13
35
Miscellaneous
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.