Powered By Kitlog Pro v2.0
JAMES'S WEB SITE
RV-10
All
4-16-2011
< Previous Log Entry
Next Log Entry >
Date:
4-16-2011
Number of Hours:
6.50
Manual Reference:
6-2
Brief Description:
Vertical Stabilizer
Clamped left and right spar caps into place before drilling after trimming and deburring. (Image 1)
Match drilled spar caps clecoed (Image 2)
Drilling and clecoing the spar caps to flange side (Image 3)
Test fit spar caps
Drilling the spar caps
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
14
43
Empennage
13
35
Miscellaneous
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.