Bill potted in the hardpoints that will be used to hold the back of the panel up. I mounted the hobbs meter oil pressure switch and the oil pressure sensor to the firewall. Bill and I got together and mounted the two battery trays and installed one of two Optima battries. We also exchanged the nylon lock nuts on the main landing gear bolts for the factory supplied upgrade lock nuts. Good day!