KitLog pro

Powered By Kitlog Pro v2.0

Dawsons Brothers Web Site
' style=
Date:  7-23-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Hardpoints and Towbar

I drilled and tapped the nose gear for two allen head bolts for the Towbar to grab. It works just fine.
I also dug out the fiberglass and foam for five one inch hard points for the overhead panel. I cut the 1/4 inch by 1 inch aluminum bar into five 1 inch pieces, scuffed them up and glued them in place.
I also installed two nutplates, one on each end of the overhead panel. Next time I will drill and tap the hard points and the overhead panel will be easily installed and removed for future maintenance.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.