Powered By Kitlog Pro v2.0
Dawsons Brothers Web Site
Velocity XLFG
All
9-23-2006
< Previous Log Entry
Next Log Entry >
Date:
9-23-2006
Number of Hours:
6.00
Manual Reference:
Brief Description:
Toe brakes / oil cooler lines
I have the new toe brake / rudder system installed and the rudders adjusted. I still have to bleed the brakes.I also shortened the oil cooler lines. This made them less stiff and flow along the engine mount for a much cleaner look.
Better control with toe brakes!
Oil cooler lines corrected.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Velocity XLFG Home
Category
# Logs
# Hours
All
419
3445
Airplane
87
768
Avionics
8
40
Canard
24
199
Doors
34
264
Electric
23
184
Engine
4
24
Firewall Back
30
204
Flight controls
11
82
Fuselage
90
660
Hardware
7
50
Interior
3
12
Miscellaneous
7
35
Panel
8
349
Panel
5
45
Prop
2
4
Systems
42
384
Weight and Balance
1
8
Wings
33
133
Copyright © 2001-2024 Matronics. All Rights Reserved.