Brief Description: Leading edge ribs cleanup start.
Took 3 ribs and the landing light mount, deburred them, hit their joint parts with scotchbright, cleaned them up with acetone, and hit them with cortec. Then went through the inside leading edge holes from those ribs and started cleaning them up as well so i can eventualy close the leading edge. Drilled leading edge rib #1 fuel line hole and inserted bushing.