Powered By Kitlog Pro v2.0
Larry Winger's 601XL Project
Zodiac CH 650
Fuselage
9-19-2009
< Previous Log Entry
Next Log Entry >
Date:
9-19-2009
Number of Hours:
1.50
Manual Reference:
Brief Description:
Installed horizontal stabilizer
After doing final riveting in the tail area, I set the horizontal stabilizer in place, riveted the H.T. attachment brackets in place, then secured the stabilizer with the four specified bolts.
Stabilizer mounted and ready for rigging
Another view
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac CH 650 Home
All
Avionics
Empennage
Engine
Fuselage
Miscellaneous
None
Planning
Shop Supplies
Tools
Total Hours
Wings
Work Area
Copyright © 2001-2013 Matronics. All Rights Reserved.