Powered By Kitlog Pro v2.0
Larry Winger's 601XL Project
Zodiac CH 650
Wings
5-19-2010
< Previous Log Entry
Next Log Entry >
Date:
5-19-2010
Number of Hours:
2.25
Manual Reference:
Brief Description:
Placed aileron ribs and balance arm
Tonight I measured and drilled for the two new aiileron ribs that sandwich the balance arm. Then I measured, placed and drilled the holes through the two ribs and balance bar, shown below.
Balance bar in place
Rivet lines ready for the two ribs
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac CH 650 Home
All
Avionics
Empennage
Engine
Fuselage
Miscellaneous
None
Planning
Shop Supplies
Tools
Total Hours
Wings
Work Area
Copyright © 2001-2013 Matronics. All Rights Reserved.