KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  2-13-2009
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Misc. fuselage prep

I attached the step fairings to the fuselage bottom with L angles and installed the upper elevator cable fairlead. So much for the "should take less that one hour" prediction.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.