KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  7-13-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Engine wire routing and nosebowl epoxy

Today was a continuation of engine wire routing cleanup. Previously my EGT leads on the left side of the plane were wrapped directly to the engine mount. I added an Adel clamp to protect the mount from abrasion. Before today my bundle of wires, most notably the spark plug wires, were silicone taped to one of the oil lines from the oil cooler. Today I bundled them to provide separation. Finally, I added a coat of epoxy with flox to the face of the nosebowl inlets.
' style=

EGT leads secured using Adel clamp

EGT leads secured using Adel clamp

' style=

Wire bundle moved away from oil lines

Wire bundle moved away from oil lines

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.