KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  10-31-2012
Number of Hours:  1.50
Manual Reference:  
Brief Description:  2 - Wired power to all remaining switches

After doing over an hour of research on grounding requirements for the transponder and V10 comm radio (not included in time), I wired the power from fuses to all remaining switches. These were the Nav/Strobe switch, the Landing light/Wig-Wag switch and the Pitot Heat switch.
' style=

Nav/Strobe and landing light switches wired for power

Nav/Strobe and landing light switches wired for power

' style=

Pitot heat switch wired as well

Pitot heat switch wired as well

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.