Tonight I installed the CHT probes for all six cylinders and routed the cables through the nylon block in the rear baffle. The cable ties will be removed and replaced with heat resistant material when I'm through with wire routing on top of the engine. My builder's log will go dark for about 3 weeks because of meetings at work, out of state travel and then a national convention. Watch this space. I'll be back soon.