Powered By Kitlog Pro v2.0
Larry Winger's 601XL Project
Zodiac CH 650
All
6-12-2012
< Previous Log Entry
Next Log Entry >
Date:
6-12-2012
Number of Hours:
0.75
Manual Reference:
Brief Description:
Installed fuel pressure sender & fuel fittings
Once I received all the final parts from MGL (UMA fuel pressure sender) and Summit Racing (90 degree swivel seal hose fitting) I was able to install the sender and complete the last connection in the fuel system. Mark that one off the list.
UMA fuel pressure sender in place
Final connection in fuel system
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac CH 650 Home
All
Avionics
Empennage
Engine
Fuselage
Miscellaneous
None
Planning
Shop Supplies
Tools
Total Hours
Wings
Work Area
Copyright © 2001-2013 Matronics. All Rights Reserved.