KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  5-20-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  1 -Reinstalled control cables into panel

In order to determine cable routing and work around it, I installed the cable control knobs into the panel frame, giving them a full tightening. I am not going to connect the ends to the throttle, mixture control, carb heat or cabin heat until I've completed the panel wiring and know that I won't have to remove it again.
' style=

Control knobs tightened in place

Control knobs tightened in place

' style=

Routing behind

Routing behind

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.