Brief Description: More rudder pedal and started main power cable
The new rudder blocks needed their leading edge to be rounded off a bit and the bearing install revealed a tiny misalignment between the top and bottom bearing inserts so before applying one coat of varnish both tasks were completed.
Then it was off to produce 8 main power cable routing tabs and install the positive lead between the battery and the main solenoid.