KitLog pro

Powered By Kitlog Pro v2.0

Darrel's Kitfox - SS7
' style=
Date:  1-21-2019
Number of Hours:  3.90
Manual Reference:  None
Brief Description:  Instrument panel layout, fabric frame

Made a run to Staples to have rev A of the panel plan printed out.

Fabricated the frame that will be used to evaluate the Stewart's System material and paint.

Added the drain valves to the compressed air "labyrinth"/.

Glued on the panel template.

All in all a pretty good day if I do say so myself.
' style=

Air de-humidifying labyrinth

Air de-humidifying labyrinth

' style=

Material/paint test frame

Material/paint test frame

' style=

The planned panel

The planned panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.