Powered By Kitlog Pro v2.0
Darrel's Kitfox - SS7
DEW2
Fuselage
4-4-2020
< Previous Log Entry
Next Log Entry >
Date:
4-4-2020
Number of Hours:
3.80
Manual Reference:
Fuselage assembly
Brief Description:
Worked on door latches
Decided to change two depth dimensions on the starboard door latches so I remade them and reinstalled.
Also polished the pieces on the port door.
Fabricated the striker plates for both doors.
Am now prepared to declare the design of the door latch system complete. . . . . sure hope it works in flight.
Am adding a picture of all of the test and evaluation pieces that it took to get the design where it is.
The cemetary
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
DEW2 Home
Category
# Logs
# Hours
All
623
2340
Avionics
39
146
Basic Kit
3
14
Empennage
25
93
Engine
33
130
Engine
2
7
Fabric cover
82
293
Final assembly
9
48
Fuselage
119
501
Inspection
1
1
Kitfox Avionics
39
146
Kitfox tooling
6
14
Kitfox Undercarriage
11
37
Kitfox wings
64
228
Lighting
2
12
Miscellaneous
25
88
Paint System
87
335
Tooling
2
0
Tooling
6
14
Tools
2
0
Wings
2
5
Wings
64
228
Copyright © 2001-2020 Matronics. All Rights Reserved.