Brief Description: Started installation of the aero fairings on the l
Started installation of the aero fairings on the lift struts. Determined most of the cut lengths on the right strut and located the cut out for the jury strut clamps.
Installed shims to eliminate any looseness of the jury strut attachment clamp.