KitLog pro

Powered By Kitlog Pro v2.0

Darrel's Kitfox - SS7
' style=
Date:  5-3-2020
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Mounted the engine heater

Decided to add a third leg on the flange the shore power connector mount to - layed it out, fabricated, and installed it.

Routed the electrical lines for the heater.

Completed the clamp for the electrical connection to shore power.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.