Powered By Kitlog Pro v2.0
Darrel's Kitfox - SS7
DEW2
All
12-6-2019
< Previous Log Entry
Next Log Entry >
Date:
12-6-2019
Number of Hours:
3.00
Manual Reference:
Final details
Brief Description:
Began setting up for rudder cable completion
Began rudder cable final installation / set up. Verified cable routing clearances and set length with rudder in correct position.
Started to decide brake line routing and cut one section three times to verify it still wasn't long enough.
Applied feather fill to the top cowl.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
DEW2 Home
Category
# Logs
# Hours
All
623
2340
Avionics
39
146
Basic Kit
3
14
Empennage
25
93
Engine
33
130
Engine
2
7
Fabric cover
82
293
Final assembly
9
48
Fuselage
119
501
Inspection
1
1
Kitfox Avionics
39
146
Kitfox tooling
6
14
Kitfox Undercarriage
11
37
Kitfox wings
64
228
Lighting
2
12
Miscellaneous
25
88
Paint System
87
335
Tooling
2
0
Tooling
6
14
Tools
2
0
Wings
2
5
Wings
64
228
Copyright © 2001-2020 Matronics. All Rights Reserved.