KitLog pro

Powered By Kitlog Pro v2.0

Darrel's Kitfox - SS7
' style=
Date:  2-15-2019
Number of Hours:  3.50
Manual Reference:  Final assembly
Brief Description:  Fabricated and installed nut plates

Rolled on first coat of white primer on paint test panel.
Removed the HS.
Threaded mounting holes for PK screws.
Fabricated nut plates for the small (rear) part of the inspection panel.
Fabricated and installed mounting tabs for the ones that had to be removed (due to interferring with the large inspection panel).
' style=

Nut(s) plate

Nut(s) plate

' style=

Replacement tab

Replacement tab

' style=

Small rear plate installed

Small rear plate installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.