KitLog pro

Powered By Kitlog Pro v2.0

Darrel's Kitfox - SS7
' style=
Date:  12-3-2018
Number of Hours:  7.10
Manual Reference:  Various
Brief Description:  ASI line, Mag line, Pitot tube orientation, routin

Fabricated line routing guides, fabricated pitot tube alignment guides (four each), installed pitot line, install magnetometer wiring.

Overall a pretty good day. Did run into a self-induced problem when I fabricated the pitot tube alignment guide (want to be sure that it will take extra ordinary force to twist the pitot tube out of alignment) without concern for fitting the assembled unit onto the wing. Opps. Had to fab a new mounting plate and alignment tab.
' style=

Five out of four, not a bad day

Five out of four, not a bad day

' style=

Magnetometer routing

Magnetometer routing

' style=

Pitot routing

Pitot routing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.