Brief Description: More on preparing the wings for covering
Sanded to profile the entire leading edges (both panels), added epoxy to shape one of the number 2 ribs (bottom side, under the tank) to proper profile, drilled the wing tip mounting holes, sanded and added additional Superfil to the wing tips and started work on the pitot probe installation design.