KitLog pro

Powered By Kitlog Pro v2.0

Darrel's Kitfox - SS7
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-9-2018
Number of Hours:  4.50
Manual Reference:  Leading egde prep
Brief Description:  More on preparing the wings for covering

Sanded to profile the entire leading edges (both panels), added epoxy to shape one of the number 2 ribs (bottom side, under the tank) to proper profile, drilled the wing tip mounting holes, sanded and added additional Superfil to the wing tips and started work on the pitot probe installation design.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.