KitLog pro

Powered By Kitlog Pro v2.0

Louies Web Site
' style=
Date:  8-4-2012
Number of Hours:  2.70
Manual Reference:  
Brief Description:  Top cowling

Sanded down the left front of the top cowling to match the top edge of the bottom cowling. Layed up two layers of fiberglass over the left edge of the top cowl to cover where the front edge was sanded and over the filled patch where the cowl had to be extended.

Installed nut plates on the top of the fuselage front panel to fasten the top cowling.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.