KitLog pro

Powered By Kitlog Pro v2.0

Louies Web Site
' style=
Date:  7-5-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Wiring and pitot & static lines

Put a sheath over the run of pitot, static lines and Dynon ADAHRS cable where they are routed on the right side of the cockpit area under the top longeron. Further secured the cable and lines on the right side behind the cockpit with plastic ties.

Made up a 3 conductor cable to connect the flap position sensor behind the flap actuator forward to the Dynon unit. Tested fit of wires and pitot, AOA lines at the top of the cockpit area under the top longeron.
' style=

Sheath over right side cables

Sheath over right side cables

' style=

Right side cable run forward

Right side cable run forward

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.