KitLog pro

Powered By Kitlog Pro v2.0

Louies Web Site
' style=
Date:  5-25-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Instrument panel

Cut a hinge to the correct length for the glove box door. Fit the hinge to the instrument panel and to the door. Drilled rivet holes and countersunk for -3 flat head riviets. Trimmed the door to fit. Riveted the hinge to the door.

Sanded the CF overlay panel to smooth out the added resin. Cleaned with lacquel thinner and applied one coat of clear coat.

Picked up instrument panel label tape from Craig Office Supply. Printed several test labels.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.