KitLog pro

Powered By Kitlog Pro v2.0

Louies Web Site
' style=
Date:  5-19-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Instrument panel

Layed out the location for the switches, controls, and glove box. Drilled holes for the controls. Cut out the panel for the glove box door. Determined the size of the glove box. Made a foam form the size of the glove box and epoxied it together. The form will be used to make a fiberglass box to use as the glove box. Experimented with different locations for the fuse blocks. Looks like the fuse blocks will work best under the right side of the instrument panel using the Hella fuse blocks. The fuse panel will be on a hinge to swing up and out of the way.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.