Worked on smoothing the resin on the left gear leg fairing. Prepared gear leg fairing mold for another layup. Layed up another CF gear leg fairing for the right side using epoxy resin. Began adding clay to the wheel fairing to cover the brake cutout area. This will smooth air flow around the brake and gear leg axle attachment.