Cured the plenum top by heating with a heat gun and let it cool. Located mounting holes for the plenum top. Installed 20 8x32 rivnuts in the flanges to mount the top. Finish trimming the plenum top and mounted it to the plenum flanges. Checked fit of top cowling and how to fabricate a duct leading from the cowl openings to the plenum openings.