Began installation of the CCA-4 wires from the battery to the firewall. Installed clamps to keep the wires separated and secure from vibration. Filled the open space of the grommets in the floor with Permatex "Ultra Black" sealing material to keep the wires in place and not pressing against teh grommet sides.