KitLog pro

Powered By Kitlog Pro v2.0

Louies Web Site
' style=
Date:  9-25-2010
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Left top wing fairing

Sanded the 2 layers of CF layup to be as smooth as possible for the final top layer of CF. Filled low areas with thick epoxy filler. Put on the final layer of CF twill cloth. After the epoxy cured, put on another coat of epoxy to fill the weave of the cloth.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.