KitLog pro

Powered By Kitlog Pro v2.0

Frans Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-30-2009
Number of Hours:  80.00
Manual Reference:  M3X-57-00-111
Brief Description:  Wing

10-30-2009 1700-1930 (2.5 hours)
Main Spar Sanding and prepping for Alodine

10-31-2009 0815-1230 (4.25 hours)
wet sanded and Scotch-brited Port Spar and Alodined inside and out.

11-1-2009 0800-1030 (2.50 hours)
Repaired numerous misinstalled rib rivets and sanded / prepped for Alodine.

11-13-2009 1230-1400 (1.5 hours)
Pre-punched (10) mounting holes into all ribs.

11-14-2009 0730-1445 (7.25 hours)
Built rib #9 support bracket, cut tubes for drag strut, prepped tubes for Alodine

11-15-2009 0715-1145 (4.50 hours)
Scotch-brite, washed, cleaned ribs and drag strut for Alodine.

11-15-2009 1430-1700 (2.50 hours)
Alumiprep all ribs.

11-20-2009 0715-1215 (5.00 hours)
Alodined port wing ribs and drag strut tubes.

11-21-2009 0745-1215 (5.00 hours)
Completed Alodine on drag strut, leading edge and trailing edge tubes.

11-22-2009 0800-1230 (4.50 hours)
Drilled drag strut holes, drilled drag strut lower plate, Marked placing for ribs on spar.

11-24-2009 1730-2045 (3.25 hours)
Removed factory Spar H-brace rivets that popped out when tube was compressed into circular position.. Reinstalled correctly.

11-25-2009 1415-1600 (1.75 hours)
Installed ribs temrporarily on spar.

11-26-2009 0700-1130 (4.50 hours)
Completed installation of spars and setup proper spacing.

11-27-2009 0715-1330 (6.25 hours)
Installed Rib Boot and end rib temporarily with clecoes. Temporarily installed LE and TE tubes and set ribs to properly contact.

11-28-2009 0700-1315 (6.25 hours)
Fabricated LE and TE splices. Assembled drag strut temporarily.

12-5-2009 0730-1300 (5.5 hours)
Due to tube shape defect, fabricated a second set of drag strut tubes, cleaned and prepped for alodine.

12-6-2009 0745-1100 (3.25 hours)
Alodined and installed drag strut.

12-18-2009 1115-1545 (4.50 hours)
Drag Strut final fitting and riveting to Root rib - Left Wing

12-19-2009 0730-1315 (5.75 hours)
Drag Strut Final Assembly to bottom plate, installed and riverted Strut support to spar.
' style=

Clean and Alodine...

Clean and Alodine...

' style=

Temporary Installation of Ribs

Temporary Installation of Ribs

' style=

Drag Strut

Drag Strut

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.