KitLog pro

Powered By Kitlog Pro v2.0

N812CH
' style=
Date:  1-23-2010
Number of Hours:  5.00
Manual Reference:  8.3-5
Brief Description:  Prep'd horizontal stabilizer front spar, spar cap

8.3 Prepared the inboard hinge bracket assembly and fabricated the front spar attachment brackets.

8.4 Fabricated the spar caps and stringers.

8.5 Assembled the front spar and finalized preparation of all part for priming.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.