Powered By Kitlog Pro v2.0
N812CH
RV-10
All
1-23-2010
< Previous Log Entry
Next Log Entry >
Date:
1-23-2010
Number of Hours:
5.00
Manual Reference:
8.3-5
Brief Description:
Prep'd horizontal stabilizer front spar, spar cap
8.3 Prepared the inboard hinge bracket assembly and fabricated the front spar attachment brackets.
8.4 Fabricated the spar caps and stringers.
8.5 Assembled the front spar and finalized preparation of all part for priming.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
25
101
Empennage
25
101
Copyright © 2001-2024 Matronics. All Rights Reserved.