Powered By Kitlog Pro v2.0
N812CH
RV-10
All
1-16-2010
< Previous Log Entry
Next Log Entry >
Date:
1-16-2010
Number of Hours:
7.50
Manual Reference:
6.5, 7.1-6
Brief Description:
Initial preparation and assembly of rudder section
6.5: 1-3 Finished riveting vertical stabilizer ribs and front spar to rear spar. Vertical stabilizer ready for priming.
7.2 & 7.3 Trimmed rib parts, shear clips and stiffeners. Deburred all parts.
7.4 Preparred rudder horn and clecoed to bottom rib.
7.5 Clecoed together all shear clip/stiffener assemblies and attached them to the rudder spar.
7.6 Prepared top and counterbalance ribs and clecoed to rudder spar.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
25
101
Empennage
25
101
Copyright © 2001-2024 Matronics. All Rights Reserved.