KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  5-25-2019
Number of Hours:  3.80
Manual Reference:  
Brief Description:  Appling Second Coat of Camouflage Paint

Rubbed down the fuselage with the 3M pad and then ironed down the edges that need smoothing. Completed the second coat of green paint. Set up the tan paint and started the second coat of paint on the tan areas. Completed most of the left side and the top before the end of the day.
' style=

Right Side of Aircraft

Right Side of Aircraft

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.