KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  8-14-2018
Number of Hours:  2.30
Manual Reference:  
Brief Description:  Primer Painting the Lower Left Wing Bottom

FedEx delivered two quarts of EkoFill primer and one quart was brought to the airport.

Used a wire brush to clean the welds on the forward brace of the step on the left wing stub. Painted the welds and brace with black primer.

Turned the lower left wing over so the top side was up on the table. Finished the second coat of primer on the top of the lower left wing. Turn the wing back over so the bottom is up on the table. Cleaned the bottom of the wing with the cleaning solution and rinsed with clear water. Dampened a section of the wing and then applied a coat of primer with a foam brush. Continued along the wing section by section applying a coat of primer. Ran out of day about 3/4 way around the wing which will be finished during the next work day.
' style=

Bottom of Lower Left Wing

Bottom of Lower Left Wing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.