Brief Description: Sanding the Bottom of the Upper Right Wing
Sanded the bottom of the upper right wing with the fine foam sanding blocks. Went over the bottom of the wing with the small iron covering the tape edges and any spots which didn't lay smooth.
Installed four cable fairing on the top of the elevator and one on the bottom of the right wing. Patches over each fairing will be added in the next work day.