KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  7-11-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Primer Painting of Bottom of the Upper Left Wing

Used the small iron set at about 300 degrees to iron several places on the taping on the top of the wing. Opened the primer paint can and stirred the paint until consistent. Touched up each of the spots which were ironed on the top of the wing. Turned the wing over so that the bottom was up. Wetted down a section of the wing with a damp rag. Sprayed the cleaning solution on the wetted area. Wiped the soaped area with the rag. Rinsed the rag and wiped down the cleaned area a second time. Wet the next section and repeated the process for the remainder of the wing. Applied a coat of primer to the wing by wetting a section and then painting that section. Repeated the process for the remainder of the wing. Started painting the second coat of primer at the beginning of the first coat. Completed the front half of the wing and stated on the first section of the alf section. The remaining part of the wing will be completed on the next work day.
' style=

Bottom of Upper Left Wing

Bottom of Upper Left Wing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.