KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  10-12-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Start of Power Connections from CB to Switches

Built and connected the power wires for the ignitions, fuel pump and the electric scavenge pump. Made the connections with red 18 gauge wire with crimped eyelets for all of the switch connections and two of the circuit breakers. The ignition circuit breakers required blade connectors. All ends were covered with shrink tubing.
' style=

Red Power Leads Added

Red Power Leads Added

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.