Repositioned the mixture control arm on the carburetor to accept the cable for a push pull operation. Cut a segment of 1/2 by 1/8 inch steel to fit between the engine mounting arms at the proper mounting location. Drilled a 3/16 inch hole at top of center to accept an AN 3 bolt and mounting clamp. Welded the bracket in place and test fitted the mixture control cable. It functioned as required. Used a wire brush to clean up the welds for latter painting.
Reviewed the throttle quardren design and worked on a configuration which would provide for duel throttles. Much more work here to be completed.