Brief Description: Inspection of Joint Welds and Cutting Top and Bott
Completed an inspection of the fuselage side welds and marked any joints which needs some more attention. Completed wire bush cleanup of areas to be welded. Completed the needed welds.
Identified the three top and the three bottom cross tubes. Cut the ends of the tubes to fit to each fuselage side ensuring that each was the same length. Spot welded each tube in place using a ratchit strap to hold everything in place.