KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  6-13-2017
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Construction of Cowling Top

Constructed a clamping frame to support the joining of the top sheet to the cowling ring. Added a third line of rivets to the cowling ring edge using the clamp frame to hold the edges close together for riveting. Move the cowling assembly to the aircraft. Rigged a come-along to the ceiling in front of the engine and suspended the cowling assemble over the engine. Completed an initial alignment over the engine and checked for proper opening space.
' style=

Clamp frame for the Cowling

Clamp frame for the Cowling

' style=




' style=

Initiall cowling opening check

Initiall cowling opening check

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.