Brief Description: Installed Landing Gear Mount Bolts
Aligned the drill about one inch below the longeron of the fuselage centered on the landing gear leg and drilled a level 1/4 inch hole through the leg and the fuselage. Repeated the drilling for the remaining three legs of the landing gear. Inserted an AN4-17a bolt through each mounting point. Added a heavy duty tang and self locking nut to each bolt on the inside of the leg.