Powered By Kitlog Pro v2.0
Leos Web Site
RV-10
All
12-17-2018
< Previous Log Entry
Next Log Entry >
Date:
12-17-2018
Number of Hours:
30.00
Manual Reference:
Brief Description:
Observe Engine Build
I was able to go to the Lycoming Factory Thunderbolt group to watch my engine being built. The 30 hours really don't count in the build time, but rather an education.
The people at Lycoming couldn't have been more kind with their time and expertise.
Brand new 540 Thunderbolt
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
465
3762
Avionics
10
48
Avionics
9
55
Canopy
9
55
Commentary
3
20
Controls
14
72
Cowel
4
48
Doors
17
100
Doors
30
263
Electrical
57
419
Electrical
10
82
Empennage
10
98
Engine
24
224
Fuselage
52
355
Horz Stab and Elevat
6
36
Instrument Panel
57
419
Interior
14
72
Interior
30
263
Misc.
6
57
Miscellaneous
6
57
None
2
Overhead
8
49
Painting
9
307
Prop
1
20
Stabilizer/Elevator
10
82
Tailcone
17
100
Things learned
8
49
Vert Stab and Rudder
3
20
Vert Stab/Rudder
6
36
What have I learned
2
2
Wings
31
354
Copyright © 2001-2024 Matronics. All Rights Reserved.